Midway Airport Home→Posts→Central PlantsProject DescriptionMidway Airport CHICAGO, IL The Hill Group was selected as the Engineer, Procure, and Construct Organization for the Central Heating and Refrigeration Plant serving Midway Airport’s new terminal. Hill, serving as the Prime Design and Build Contractor, installed 5,500 tons of refrigeration, ice thermal storage system and four 600-boiler horsepower 60 psi steam horizontal fire tube …
Merchandise Mart
Merchandise Mart Home→Posts→Central PlantsProject DescriptionThe Hill Group was the prime contractor to design and build the modifications to the district chilled water plant in The Merchandise Mart. This is the fourth plant connected to the chilled water piping distribution system serving the Downtown and River North areas. Seven new 1,920-ton centrifugal chillers are arranged to work in conjunction with the …
Skokie Hospital
Skokie Hospital Home→Posts→Central PlantsProject DescriptionThe Hill Group installed the mechanical systems in the new central plant building serving the main hospital, the existing and future Professional office buildings. The project includes: four 1,000 ton centrifugal water chillers, four cooling towers, pumps, and four 400 boiler horsepower high pressure steam boilers. Piping is routed through buildings and tunnels. Hill assumed responsibility …
Blue Cross Blue Shield
Blue Cross Blue Shield Home→Posts→Central PlantsProject DescriptionThe Hill Group was responsible for the process mechanical construction for the district chilled water production plant. Project included setting of mechanical components and piping of ammonia refrigeration system. Two rotary screw compressors were installed for an initial capacity of 4,000 tons. The piping systems are designed for 16,000 tons. Initially glycol will be …
McCormick Place
McCormick Place Home→Posts→Central PlantsProject DescriptionThe Hill Group did the piping and refrigeration work associated with this facility to provide energy and services to the entire McCormick Place Complex. The project included installing three Trigen natural gas turbine and/or electric motor generator driven 2,200 ton ammonia refrigerant screw compressor packages, an 80,000 pound per hour gas fired high pressure steam water …
Alexian Brothers Medical Center
Alexian Brothers Medical Center Home→Posts→Central PlantsProject DescriptionThe Hill Group was awarded the mechanical work for the renovation and additions to the central mechanical plant. The project, to be performed in three phases over three years, includes: demolition of three existing boilersdemolition of a centrifugal chiller and an absorption chillerrelocation of an existing 1,000 ton and a 650 ton chillerretrofitting the …